Welcome to the PW current projects page. Please click on a project to view details
Client: |
Federal Ministry of Works |
Contractor: |
PW Nigeria Ltd |
Location: |
Taraba State, Nigeria |
Value: |
$25m |
Duration: |
on going |
Details: |
16km road rehabilitation and 2 bridges crossing River Donga and flood plain. Bridge One structure 125m long, 5 span reinforced concrete bridge. Bridge Two structure 525m long, 25 span reinforced concrete bridge. Both bridges on 1.0m diameter concrete in situ bored piles. |
Client: |
Chevron Credit and Thrift Society |
Contractor: |
P.W. Nigeria Ltd. |
Location: |
Lagos, Nigeria |
Value: |
$ 7.7m |
Duration: |
November 2003 to Date |
Details: |
Construction of 8km asphalt surfaced estate roads. Construction of reinforced concrete drains; sandcrete block and mesh fencing; and bases and plinths for electrical services. |
Client: |
Federal Ministry of Works and Housing |
Contractor: |
P.W. Nigeria Ltd. |
Location: |
Oyo State, Nigeria |
Value: |
$ 125.0m |
Duration: |
March 2001 to Date |
Details: |
Construction of a 45 km four lane divided highway with 9200m under drains and 4,000m culverts. Construction of 4 major grade separated interchanges. Construction of 2 pedestrian and 11 vehicular underpasses. Construction of 13 River Bridges and 5 Overhead Bridges. Construction of toll plaza and reinforced concrete median barriers, concrete box and ring culverts and concrete lined drains. |
Client: |
Federal Ministry of Works and Housing |
Contractor: |
Joint Venture between PW Nigeria Limited & RCC Nigeria Limited |
Location: |
Oyo State, Nigeria |
Value: |
$ 104.0m |
Duration: |
April 2003 to Date |
Details: |
Construction of a 45km four lane divided highway. Construction of 30 underpasses and 5 No. bridges. Construction of toll plaza and reinforced concrete median barriers and concrete lined drains. |
Client: |
Kaduna State Government |
Contractor: |
P.W. Nigeria Limited |
Location: |
Zaria, Nigeria |
Value: |
$ 4.5m |
Duration: |
|
Details: |
Construction of a 62.2m reinforced concrete bridge. Construction of a 3.1km asphalt surfaced dual carriage approaches. Construction of median kerbs and reinforced concrete line drain. |
Client: |
Federal Ministry of Works and Housing |
Contractor: |
P.W. Nigeria Limited |
Location: |
Benue State, Nigeria |
Value: |
$ 25.0m |
Duration: |
June 2000 to Date |
Details: |
Construction of 100km of asphalt surfaced single carriageway. |
Client: |
Lagos State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$15m |
Duration: |
15 months |
Details: |
Dredged filling, construction of jetty and terminal buildings including access infrastructure, car parks and retail outlets for new water taxi network |
Client: |
Sierra Rutile Ltd |
Contractor: |
PW Mining International (Sierra Leone) |
Location: |
Sierra Rutile Mine Site, Sierra Leone |
Value: |
$2.5m |
Duration: |
2008 |
Details: |
Construction of foundations and structures for new Power House and Rutile Storage Dome on live rutile production mine. |
Client: |
Property Development |
Contractor: |
PW Ghana Ltd |
Location: |
Airport Residential Area, Accra |
Value: |
$10m |
Duration: |
2007 to 2008 |
Details: |
Residential Development of 42 luxury 3 bedroom apartments, for sale to private buyers. |
Client: |
Sokoto State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Sokoto State, Nigeria |
Value: |
$5m |
Duration: |
12 months |
Details: |
Design and construction of 4 span reinforced concrete bridge, together with surface dressed approach roads including all associated works |
Client: |
Kaduna State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Kaduna State, Nigeria |
Value: |
$13m |
Duration: |
12 months |
Details: |
Design and construction of asphalt surfaced dualized road including all associated works |
Client: |
Sokoto State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Sokoto State, Nigeria |
Value: |
$18m |
Duration: |
12 months |
Details: |
Design and construction of surface dressed roads including all associated works |
Client: |
Sokoto State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Sokoto State, Nigeria |
Value: |
$17m |
Duration: |
12 months |
Details: |
Design and construction of surface dressed roads including all associated works |
Client: |
Lagos State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$26m |
Duration: |
24 months |
Details: |
Design and construction of asphalt surfaced roads including all associated works |
Client: |
Lagos State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$36m |
Duration: |
18 months |
Details: |
Upgrade and overlay of township / urban roads including installation of new drainage system and outfall |
Client: |
Lagos State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$55m |
Duration: |
12 months |
Details: |
Upgrade and overlay of township / urban roads including installation of new drainage system and outfall |
Client: |
Lagos State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$20m |
Duration: |
15 months |
Details: |
Dredged filling, construction of jetty and terminal buildings, including access infrastructure, car parks and retail outlets for new water taxi network |
Client: |
Federal Airports Authority of Nigeria |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$29m |
Duration: |
18 months |
Details: |
Rehabilitation and overlay of domestic runway and taxiways, together with all associated works |
Client: |
SSL Properties Ltd |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$8m |
Duration: |
12 months |
Details: |
Construction of roads, footpaths, drains, water supply and other required infrastructure for major private housing development in Lagos |
Client: |
Trojan Estates |
Contractor: |
PW Nigeria Ltd |
Location: |
Lagos State, Nigeria |
Value: |
$31m |
Duration: |
24 months |
Details: |
Construction of roads, footpaths, drains, water supply and other required infrastructure for major private housing development in Lagos |
Client: |
Plateau State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Plateau State, Nigeria |
Value: |
$12m |
Duration: |
12 months |
Details: |
Design & construction of asphalt surfaced township roads, including street lighting, drainage and all other associated works |
Client: |
Plateau State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Plateau State, Nigeria |
Value: |
$7m |
Duration: |
9 months |
Details: |
Construction of asphalt and surface dressed road, together with all other associated works |
Client: |
Benue State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Benue State, Nigeria |
Value: |
$24m |
Duration: |
24 months |
Details: |
Design and construction of surface dressed road, together with bridges and all other associated works |
Client: |
Benue State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Benue State, Nigeria |
Value: |
$8m |
Duration: |
12 months |
Details: |
Design and construction of surface dressed road, together with all other associated works |
Client: |
Benue State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Benue State, Nigeria |
Value: |
$12m |
Duration: |
12 months |
Details: |
Design and construction of surface dressed road, together with all other associated works |
Client: |
Adamawa State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Adamawa State, Nigeria |
Value: |
$28m |
Duration: |
18 months |
Details: |
Construction of 4No. asphalt surfaced township roads, together with all drainage and associated works |
Client: |
Adamawa State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Adamawa State, Nigeria |
Value: |
$6m |
Duration: |
8 months |
Details: |
Design and construction of 4 span reinforced concrete bridge, including approach roads |
Client: |
Nasarawa State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Nasarawa State, Nigeria |
Value: |
$30m |
Duration: |
18 months |
Details: |
Design and construction of surface dressed road, together with 11 span reinforced concrete bridge and all other associated works |
Client: |
Zamfara State Government |
Contractor: |
PW Nigeria Ltd |
Location: |
Zamfara State, Nigeria |
Value: |
$6m |
Duration: |
6 months |
Details: |
Design and construction of surface dressed road, together with all other associated works |
Client: |
AngloGold Ashanti plc |
Contractor: |
PW Ghana Ltd |
Location: |
Obuasi Gold Mine |
Value: |
$3m |
Duration: |
5 months |
Details: |
Stabilisation of TSF North and West Walls, and Saddle 3. Berm road stabilisation and installation of berm drainage system. Work being carried out in live gold mine. |