Project: North Mara Contract Mining Operation

Client:

Placer Dome

Contractor:

PW Mining

Location:

Tanzania

Value:

Duration:

 2002 to 2004

Details:

 Open Cast Gold mining operation using O&K RH 120E and RH 40E excavators, CAT 777D Dumptrucks and full range of ancillary equipment. Contract requires the excavation and movement of 27 million BCM of ore and waste

Project: Abuakwa Bibiani Road

Client:

Government of Ghana

Contractor:

P.W. Civils (Joint Venture PW Ghana Ltd / PW Nigeria Ltd.)

Location:

Western Region Ghana

Value:

$17m

Duration:

 2003 to 2005

Details:

 80km road reconstruction project utilising natural, stabilized and crushed materials to form the pavement. All road construction materials produced from our own quarry, asphalt and batching plant in Kumasi. Road reconstruction using CAT RM350 reclaimer equipment. Road surfacing with marshall asphalt.

Project: Manso to Asankragwa Road

Client:

Ministry of Road & Transport, Government of Ghana, with funding from the World Bank

Contractor:

P.W. Civils (Joint Venture PW Ghana Ltd / PW Nigeria Ltd.)

Location:

Western Region, Ghana

Value:

US$ 10.5m

Duration:

 2002 to 2004

Details:

 33km road reconstruction project utilising stabilized natural gravel sub base and base materials to form the pavement. Road surfacing using surface dressing

Project: Jos Township Roads

Client:

Plateau State Government

Contractor:

P.W. Nigeria Ltd.

Location:

Jos, Nigeria

Value:

$ 11.5m

Duration:

 Completed February 2002

Details:

 Rehabilitation of township roads and construction of new roads. All Asphalt surfacing with surface dressed shoulders. Construction of 25,000m sandcrete block and precast concrete drains. Construction and rehabilitation of 4 No. box culverts and 700m of pipe culverts. Erection of 2 No. 14 ton steel pedestrian over bridges on single carriageways. Erection of 2 No. 19 ton steel pedestrian over bridges on double carriageways.

Project: Murtala Muhammed International Airport Rehabilitation

Client:

Federal Airports Authority of Nigeria

Contractor:

P.W. Nigeria Ltd.

Location:

Lagos, Nigeria

Value:

$ 14.8m

Duration:

 Completed Jan 2006

Details:

 Surface repairs involving milling of 75,000m2 of asphalt wearing course, Milling of markings rubber deposits. Asphalt overlay of 250,000m2 CRL and ACSC. Drainage improvement works. Pavement markings. Construction of crash road.

Project: Korle Lagoon E.R.P. Interceptor Weir & Pumphouse

Client:

Dredging International

Contractor:

PW International Ltd.

Location:

Korle Lagoon, Accra , Ghana

Value:

US$ 3.0m

Duration:

 December 2003 to January 2005

Details:

 Construction of Interceptor Weir and Pumphouse. Full scope of works associated including site clearance, sheet piling, steel H-piling, temporary cofferdam in river / lagoon, concrete works, M&E installations, siteworks and drainage. All operations carried out in house.

Project: Suleja Township Roads

Client:

Niger State Government

Contractor:

P.W. Nigeria Limited

Location:

Niger State, Nigeriaa

Value:

$ 8.0m

Duration:

 Completed May 2004

Details:

 Rehabilitation of 15km existing Asphalt and Surfaced dressed township roads. Construction of box and pipe culverts. Construction of precast reinforced concrete covered drains.

Project: Karu Infrastructure

Client:

Federal Capital Development Authority

Contractor:

P.W. Nigeria Limited

Location:

Abuja, Nigeria

Value:

$ 12.9m

Duration:

 Completed October 2005

Details:

 Reconstruction and rehabilitation 24.2km of single and dual carriage road network. Relocation of existing electrical and water services. Construction of pre-cast drains and culverts. Asphalt surfacing of entire road network. Demolition of Structures along right of way.

Project: Sokoto Township Roads

Client:

Sokoto State Government

Contractor:

P.W. Nigeria Limited

Location:

Sokoto State, Nigeria

Value:

$ 5.50m

Duration:

 Completed September 2004

Details:

 Construction of 3.4 km dual carriageway with central median. Asphalt surfacing and single coat surface dressing. Construction of 6,700m concrete drain, box and ring culverts.

Project: Kware - Salame - Gada Road

Client:

Sokoto State Government

Contractor:

P.W. Nigeria Limited

Location:

Sokoto State, Nigeria

Value:

$ 14.90m

Duration:

 Completed February 2005

Details:

 Construction of an 85 km single surface dressed carriageway. Construction of 19 No. single, double and triple cell culverts. Construction of 30 No. ring culverts and an 8 cell box culvert. 400,000m3 of earthworks.

Project: Sabon Birni Bridge

Client:

Sokoto State Government

Contractor:

P.W. Nigeria Limited

Location:

Sokoto State, Nigeria

Value:

$ 6.70m

Duration:

 Completed Jan 2006

Details:

 Construction of two no. reinforced concrete bridges on piled foundations. Construction of 7km approaches with two coat surface dressing. Construction of 1 No. single box culvert, 4 No. twin box culverts, 4 No. ring culverts.

Project: Kaduna State Township Roads

Client:

Kaduna State Government

Contractor:

P.W. Nigeria Limited

Location:

Kaduna, Nigeria

Value:

$ 21.3m

Duration:

 Completed October 2004

Details:

 Construction of 6.5km asphalt surfaced dual carriageways with median kerbs and street lightning. Construction of 34km asphalt resurfaced single carriageways. Construction of 2km two coat surface dressed single carriageway. Construction of drains and a 3 x 2 m reinforced concrete box culvert.

Project: Manona / Isa Asphalt Overlay

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$14m

Duration:

 Completed November 2005

Details:

 Asphalt overlay to existing road

Project: Kotoka International Airport Phase II Rehabilitation

Client:

Ghana Civil Aviation Authority, Accra, Ghana

Contractor:

SPI Joint Venture

Location:

Kotoka International Airport, Accra, Ghana

Value:

US$ 78m

Duration:

 December 1999 December 2002

Details:

 P.W. Limited was a part of a Joint Venture consortium that included Skanska Africa Limited and Intertec A/S from Denmark. Project scope of work included terminal building refurbishment and expansion, construction of two new aprons, installation of new radar and navigation systems, 550m extension to operational runway, new substation and generator house with equipment, surface car parking and approach roads, repairs to existing aprons, new electrical systems to control tower.

Project: Tarkwa Phase IV Bulk Earthworks Project

Client:

Goldfields Ghana Limited

Contractor:

P.W. Ghana Ltd

Location:

GFGL Mine Site, Tarkwa, Ghana

Value:

Forecast - US$ 3m

Duration:

 Completion end 2003

Details:

 Earthworks cut to fill / cut to spoil/ topsoil removal / silt control / drainage / road construction / rock removal: to construct platforms and access for gold mine expansion, in a live mine site.

Project: Tarkwa Phase IV Tailing Storage Facility

Client:

Goldfields Ghana Limited

Contractor:

P.W. Ghana Ltd

Location:

GFGL Mine Site, Tarkwa, Ghana

Value:

US$ 4.7m

Duration:

 December 2003 June 2004

Details:

 Construction of Tailings Dam utilising mine waste and borrowed materials. Full scope of works associated including site clearance, silt control and drainage. All operations will executed in an operational gold mine with highly stringent safety and environmental requirements.

Project: Obotan Gold Mine Contract Mining Operation

Client:

Resolute Amansie Limited

Contractor:

P.W. Ghana Ltd

Location:

Obotan Gold Mine, Ghana

Value:

Duration:

 1997 2003

Details:

 Contract was awarded in 1997 and mining operations were completed in 2003. Works were executed using O&K RH 120 and RH 40E excavators, CAT 777D Dumptrucks and full range of ancillary equipment. The contract required the excavation and movement of 22 million tonnes of ore and waste from two separate pits

Project: Takoradi Underwater Pipeline Stabilisation and Repair Project

Client:

General Electric International Inc., New York

Contractor:

P.W. Ghana Ltd / P.W. Resources Ltd

Location:

Takoradi Thermal Power Plant, Ghana

Value:

US$ 4.5m

Duration:

 Phase 1 February 2002 April 2002
Phase 2 August 2002 September 2002

Details:

 Correction of freespans to 24inch fuel oil pipeline and 36inch seawater intake pipeline. Correction using grout filled fabric formwork. Additional pipeline stabilisation installed using 8 tonne concrete anchor blocks placed alongside pipelines. Installation of split sleeve repair clamps to areas of pipeline affected by corrosion. All operations carried out using our own dynamically positioned crane barge St. Patrick, and works executed on fully operational pipelines.

Project: Petroleum Special Trust Fund Abuja, Nigeria

Client:

Petroleum Special Trust Fund , Nigeria

Contractor:

P.W. Nigeria Ltd

Location:

Lot 17 and 18, Nigeria

Value:

US$ 40m

Duration:

 March 1998 September 1999

Details:

 Rehabilitation and asphalt overlay of 700km of highway between Jos and Enugu in Nigeria.

Project: Refinery Road Kaduna

Client:

Department of Works and Housing, Kaduna State Government

Contractor:

P.W. Nigeria Ltd

Location:

Kaduna , Nigeria

Value:

US$ 15m

Duration:

 Duration: September 2000 June 2001

Details:

 Construction of dual carriageway in the congested district of Sabon Tasha of Kaduna city.

Project: Sokoto State Road Projects

Client:

Department of Works and Housing, Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

US$ 18.6m

Duration:

 December 1999 June 2002

Details:

 Road Rehabilitations totaling 185km in length. Scarify and repair failed sections of existing roads and replace laterite base course. Two coats of surface dressing on a repaired and existing base to Ministry specification. Road was constructed on a new alignment to replace existing road. Drainage structures reconstruction and extensions. All material produced directly in a PW Nigeria quarry established for this project. All works executed directly, no subcontracts.

Project: Lagos Airport Road Dualization Project

Client:

Federal Aviation Authority of Nigeria

Contractor:

P.W. Nigeria Ltd

Location:

Lagos, Nigeria

Value:

US$ 3.8m

Duration:

 May 2000 June 2001

Details:

 4.5km Urban Road Dualization between Domestic and Internal Airports in Lagos on a heavily congested traffic route. Scope included clear site, earthworks, laterite fill, crushed stone sub-base and base course. Three layer asphaltic concrete surfacing. Construction of all necessary side drains, U channels, pipe and box culverts. Installation of road furniture and marking. Kerbing and footpath construction. Road was constructed on existing alignment with additional carriageway alongside existing road. All material was produced directly in a PW Nigeria quarry established for this project.

Project: Design and Construction of Awajir - Tse Agberagba Road & Tse Agberagba Ogoja Road

Client:

Federal Ministry of Works, Abuja, Nigeria

Contractor:

P.W. Nigeria Ltd

Location:

Cross River State, Nigeria

Value:

US$ 16m

Duration:

 June 1997 April 2000

Details:

 Works involved design and construction of 90km of existing earth road to an overall width of 11.6m consisting of two coats of surface dressed carriageway 7.6m wide, and 2.0m single coat surfaced hard shoulder on either side. Over 600,000 cubic metres of earthworks was required to improve horizontal and vertical alignments, utilizing cut to fill, cut to spoil, and borrow to fill material processes. Considerable drainage works were undertaken in the form of new single and multiple cell pipe and box culverts from RC and precast construction methods. In a number of cases existing structures were extended where suitable. 13km of concrete U drains and 11km of concrete kerbs were constructed, with 17,000 square metres of stone pitching. Road furniture was installed, such as markings, signage and kilometer posts.

Project: Druids Glen Marriott Hotel & Country Club

Client:

Obalus Ltd

Contractor:

Sandale Construction Ltd

Location:

Co. Wicklow, Republic of Ireland

Value:

€35m

Duration:

 June 2000 April 2002

Details:

 Construction of a new 5 star hotel with 148 bedrooms, conference and function areas, leisure suite and 18 hole golf course.

Project: Ajiringano Estate

Client:

Private

Contractor:

P.W. Ghana Ltd.

Location:

East Legon, Accra, Ghana

Value:

US$2m

Duration:

 June 1999 June 2000

Details:

 Construction of two new blocks of two bedroom apartments, one 3 bedroom detached house, one 4 bedroom detached house, clubhouse, 200 square metre swimming pool, and all associated infrastructure.

Project: Zonkwa Water Project

Client:

Kaduna State Government / World Bank

Contractor:

P.W. Nigeria Ltd

Location:

Kaduna State, Nigeria

Value:

$12.0m

Duration:

 June 1995 October 1997

Details:

 Complete scheme including water intake and pumping mains to treatment works. Construction of treatment works, concrete water storage reservoirs, housing for engineers and workers. Overhead H.T electricity supply and distribution pipework in ductile iron steel 80.0km with branches to various townships

Project: Bacita Sugar Factory

Client:

NISUCO

Contractor:

P.W. Nigeria Ltd

Location:

Bacita , Nigeria

Value:

$ 10.0m

Duration:

 June 1995 December 1999

Details:

 Civil Works for sugar processing plant. Construction of factory buildings elevated fresh water towers, spray pond with pump house, clarified and filtered water tanks. Construction of reinforced concrete bases and supports. Construction of housing units, factory buildings, power house, milling plant and evaporator house.

Project: Abuja Water Supply Project

Client:

Federal Capital Development Authority

Contractor:

P.W. Nigeria Ltd

Location:

Abuja, Nigeria

Value:

$ 24.5m

Duration:

 June 1994 January 1996

Details:

 45km Main water supply in 1000mm DN in ductile steel with valves and fittings and river crossing. Construction of large concrete storage reservoirs and control Stations.

Project: Ikorodu Flyover

Client:

Lagos State Government

Contractor:

P.W. Nigeria Ltd

Location:

Lagos , Nigeria

Value:

$ 15.0m

Duration:

 December 1987 January 1989

Details:

 Construction of a Flyover Bridge at Mile 12 Lagos. Construction of a 4.2km four lane divided highway with covered reinforced concrete drains. Construction of a single and a double span river bridge.

Project: NNPC Butanisation project

Client:

NNPC / Litwin

Contractor:

P.W. Nigeria Ltd

Location:

Apapa, Lagos , Nigeria

Value:

$ 6.1m

Duration:

 May 1992 December 1993

Details:

 Civil works for LPG bulk gas station.

Project: Ipokia road

Client:

Ogun State Government

Contractor:

P.W. Nigeria Ltd

Location:

Ogun State, Nigeria

Value:

$ 3.0m

Duration:

 January 1993 April 1994

Details:

 Construction of 18km asphalt surfaced single carriage way. Construction of concrete ring culverts and reinforced concrete drains.

Project: Oturkpo Drainage Construction

Client:

World Bank / Benue State Government

Contractor:

P.W. Nigeria Ltd

Location:

Oturkpo, Nigeria

Value:

$ 1.70m

Duration:

 January 1992 January 1993

Details:

 Construction of 1.0m x 1.0m precast reinforced concrete storm water drain channeled to rice mill area. Construction of access roads.

Project: Lafiya- Karim Lamido -Balafia Road

Client:

Gongola State Government

Contractor:

P.W. Nigeria Ltd

Location:

Gongola State, Nigeria

Value:

$ 17.0m

Duration:

 May 1986 December 1991

Details:

 Construction of 48km two coat surface dressed single carriageway. Construction of 2 No. 2 x 15m span bridges, 2 No. 3 x 15m span bridges, 1 No. 4 x 15m span bridge, 1 No. 5 x 15m span bridge. Construction of reinforced concrete box and pipe culverts.

Project: NNPC Depots Jos & Biu

Client:

NNPC/NISSCO

Contractor:

P.W. Nigeria Ltd

Location:

Jos & Biu , Nigeria

Value:

$ 2.10m

Duration:

 January 1991 September 1991

Details:

 Construction of Depot buildings with fabricated steel roofing. Laying of PVC pipes for ducting. Construction of 42m Steel Tank. Construction of AGO steel tank, Construction of reinforced concrete bund walls for tanks. Construction of asphalt surfaced access roads.

Project: Plant Road and Shipping Area Rehabilitation KRPC

Client:

TOTAL Petroleum

Contractor:

P.W. Nigeria Ltd

Location:

Kaduna Oil Refinery, Nigeria

Value:

$ 4.8m

Duration:

 January 1999 May 1999

Details:

 Plant road rehabilitation with asphalt surfacing. Construction of mass and reinforced concrete shipping and demin areas. Construction of reinforced concrete drains. Cleaning and unblocking of KRPC underground sewer catch pits, basins, manholes and culverts

Project: Area B Container Terminal

Client:

Meridian Port Services

Contractor:

PW Ghana Ltd

Location:

Tema port, Ghana

Value:

$35m

Duration:

 2006 to 2008

Details:

 Construction of new container yard, 145,000m2 with office, workshop, substation, reefer racks, site services.

Project: Chirano TSF Stage 3

Client:

Chirano Gold Mines

Contractor:

PW Ghana Ltd

Location:

Chirano, Western Region Ghana

Value:

$3m

Duration:

 2008

Details:

 Stage 3 uplift of Tailings Dam on live gold mine.

Project: Syama TSF Uplift

Client:

Resolute Somisy

Contractor:

PW Mining International (Mali)

Location:

Syama Gold Mine, Mali

Value:

$3m

Duration:

 2007

Details:

 Uplift of existing TSF on Gold Mine which was being refurbished prior to recommencement of production operations in 2008

Project: Youga Gold Mine Stage 1 Tailings Dam

Client:

Burkina Mininf Company (Etruscan Resources)

Contractor:

PW Mining International (Burkina Faso)

Location:

Youga Gold Mine, Burkina Faso

Value:

$3m

Duration:

 2007

Details:

 New Tailings Storage Facility constructed for new gold mine, prior to start of production of gold in 2008.

Project: Isa Bafarawa Road

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$8m

Duration:

 Completed November 2005

Details:

 Road construction including major flood control works

Project: Sabon Birni / Rimawa Road

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$15M

Duration:

 Completed November 2005

Details:

 Design and construction of surface dressed road, including all associated works

Project: Dualization of Township Roads, Sokoto City

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto City, Nigeria

Value:

$8m

Duration:

 Completed May 2006

Details:

 Design and construction of 3 major road dualizations within Sokoto city, including all associated drainage works and services relocation

Project: Tangaza / Ruwan Wuri Road

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$9m

Duration:

 Completed May 2006

Details:

 Design and construction of surface dressed road, including all associated works

Project: Mato / Shimankar Phase 1

Client:

Plateau State Government

Contractor:

PW Nigeria Ltd

Location:

Plateau State, Nigeria

Value:

$7m

Duration:

 Completed March 2006

Details:

 Design and construction of surface dressed road including all associated works

Project: Shagari / Tsamiya / Tureta Road

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$21m

Duration:

 Completed March 2006

Details:

 Design and construction of surface dressed road including all associated works

Project: Balle / Karfen Sarki Road

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$11m

Duration:

 Completed 2007

Details:

 Design and construction of surface dressed road including all associated works

Project: Mato / Shimankar Phase 3

Client:

Plateau State Government

Contractor:

PW Nigeria Ltd

Location:

Plateau State, Nigeria

Value:

$9m

Duration:

 Completed 2007

Details:

 Design and construction of surface dressed road including all associated works

Project: Mato / Shimankar Phase 2

Client:

Plateau State Government

Contractor:

PW Nigeria Ltd

Location:

Plateau State, Nigeria

Value:

$9m

Duration:

 Completed 2007

Details:

 Design and construction of a 5 span bridge in reinforced concrete, together with surface dressed road including all associated works

Project: Nasarawa / Kawadata Road

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$13m

Duration:

 Completed 2007

Details:

 Design and construction of a reinforced concrete 4 span bridge, together with surface dressed road including all associated works

Project: Zaria / Dogon Dawa Road

Client:

Kaduna State Government

Contractor:

PW Nigeria Ltd

Location:

Kaduna State, Nigeria

Value:

$15m

Duration:

 Completed 2007

Details:

 Design and construction of asphalt surfaced road including all associated works

Project: Farfaru Fly-over Project

Client:

Sokoto State Government

Contractor:

PW Nigeria Ltd

Location:

Sokoto State, Nigeria

Value:

$7m

Duration:

 Completed March 2007

Details:

 Design and construction of a two span flyover bridge together with approach roads including all associated works

Project: Kawo Flyover Bridge

Client:

Kaduna State Government

Contractor:

PW Nigeria Ltd

Location:

Kaduna State, Nigeria

Value:

$8m

Duration:

 Completed 2006

Details:

 Construction of 16 span reinforced concrete flyover bridge in busy city centre of Kaduna

Project: Amper Dengi Basher Road

Client:

Plateau State Government

Contractor:

PW Nigeria Ltd

Location:

Plateau State, Nigeria

Value:

$3m

Duration:

 Completed 2007

Details:

 Design and construction of surface dressed road including all associated works

Project: Katsina Ala / Zaki Biam / Ugbu Buruku Road

Client:

Federal Ministry of Works

Contractor:

PW Nigeria Ltd

Location:

Benue State, Nigeria

Value:

$21m

Duration:

 Completed 2007

Details:

 Design and construction of asphalt surfaced road including all associated works


 
 
OTHER SERVICES
Airports
Oil & Gas
Water Supply & Sewerage

VIEW OUR PROJECTS
Completed Projects
Current Projects
Featured Project

ONLINE SERVICES
Request for more information
Sign up for free eNewsletter
Photo Gallery